WPS-IEW-2026-102
Rev. 1VALIDATEDISO 15614Structural MemberGMAW spray-transfer groove weld for jacket structure (impacts −20°C)
100
score
Base Metals & Thickness — QW-403 / QW-451
- Specification
- EN 10025-2 S355J2 / IS 2062 E350BR
- P-Number
- P-No. 1
- Group No.
- 1
- Dissimilar side
- Same P-No.
- Qualified range
- 16 – 25 mm
- Coupon T
- 25 mm
- Diameter
- All
- Toughness
- CVN specified
Filler Metals — QW-404 / QW-432 / QW-442
- Filler spec
- EN ISO 14341-A / AWS A5.18
- Classification
- ER70S-6 (G3Si1)
- F-Number
- F-No. 6
- A-Number
- A-No. 1
- Process
- GMAW
- Transfer mode
- spray
- Joint type
- Fillet (Tee/Lap)
- Position
- PF (3G-up)
Thermal Cycle — QW-406 / QW-407
- Preheat min
- 60 °C
- Interpass max
- 180 °C
- PWHT
- Not required
- PWHT soak
- —
- PWHT hold
- —
- Joint design
- Tee joint, a = 6–10 mm fillets both sides, partial penetration groove
Electrical, Technique & Shielding — QW-408 / QW-409
- Current
- DCEP
- Amperage
- 190–280 A
- Voltage
- 24–30 V
- Travel speed
- 300–480 mm/min
- Heat input cap
- 2 kJ/mm
- Shielding
- Ar + 18% CO2 (M21, EN ISO 14175)
- Flow
- 18 L/min
- Backing
- —
- Supporting PQR
- WPQR-2026-102
Validation Findings
latest run 06 Feb 2026 by m.deshmukh@lntecc.com
Supporting PQR referenced
Essential§7 / WPQRQualified by PQR WPQR-2026-102. Traceability established.
Base metal P-Number assigned
Essential§8.3.1Base metal group P-No. 1 Gr.1 — EN 10025-2 S355J2 / IS 2062 E350BR.
Dissimilar-metal weld compatibility
Essential§8.3.1Joint is between identical P-Numbers — no dissimilar-metal restrictions apply.
Thickness qualification range (coupon)
Essential§8.3.2 / Table 3Range 16–25 mm within qualified 16–25 mm for 25 mm test coupon.
Thickness range sanity
Non-EssentialTable 3Commercial range 16–25 mm is within conventional procedure limits.
Small-bore thin-wall root control
Non-Essential§8.4.5Small-bore root check applicable to piping only.
Minimum preheat temperature
Essential§8.4.4Preheat ≥ 60°C satisfies the 10°C minimum for P-No. 1 base metal.
Interpass temperature ceiling
Essential§8.4.3Interpass 180°C within 250°C ceiling (toughness-restricted).
Thermal window logic
Non-Essential§8.4Thermal window 60–180°C is internally coherent.
Mandatory PWHT by thickness/code
Essential§8.5.1PWHT not invoked — permitted for this material/thickness/code combination.
PWHT cycle parameters
Essential§8.5.2PWHT not required — cycle parameters not applicable.
PWHT soak window & hold adequacy
Suppl. Essential§8.5.3PWHT not required — soak band check not applicable.
F-Number consistent with process
Essential§8.3.3F-No. 6 (ER70S-6 (G3Si1)) is consistent with GMAW.
Weld-metal A-Number compatibility
Essential§8.3.3A-No. 1 weld deposit is chemically matched to P-No. 1.
Shielding gas / medium per process
Essential§8.3.5 / EN ISO 14175Shielding medium “Ar + 18% CO2 (M21, EN ISO 14175)” acceptable for GMAW.
Root backing gas protection
Suppl. Essential§8.3.5GMAW — backing gas not driven by process.
Shielding gas flow rate
Non-Essential§8.3.5Flow 18 L/min within the 10–30 L/min band for GMAW.
Current type & polarity
Essential§8.4.1DCEP polarity consistent with GMAW and ER70S-6 (G3Si1).
Amperage operating window
Non-Essential§8.4.1Amperage 190–280 A inside the GMAW operating envelope.
Arc voltage operating window
Non-Essential§8.4.1Voltage 24–30 V inside the GMAW operating envelope.
Travel speed control
Non-Essential§8.4.2Travel speed 300–480 mm/min is plausible for GMAW.
Heat input ceiling (toughness)
Suppl. Essential§8.4.2 / Table 5Heat input ≈ 1.68 kJ/mm within 2 kJ/mm toughness ceiling.
Welding position qualification
Non-Essential§8.3.4 / EN ISO 6947Position PF (3G-UP) is a recognised EN ISO 6947 designation.
GMAW metal-transfer mode
Essential§8.4.1Transfer mode “spray” recorded and code-permissible.
Process admissibility under code
Essential§6 / ISO 4063GMAW is an admissible process under ISO 15614.
ISO 15614 impact-test mandate
Suppl. EssentialTable 2 & §9.3Notch-toughness regime declared — impacts covered as supplementary essential variables.
Storage-tank qualification route
Essential§5Tank-specific routing not applicable.
IBR statutory governance
Essential§5IBR statutory route not applicable to this scope.
Administrative data completeness
Non-Essential§7.1Administrative header fields adequately populated for issue.
Group Number under toughness
Suppl. Essential§8.3.1Group No. 1 recorded for notch-toughness control.
Run History
m.deshmukh@lntecc.com
06 Feb 2026, 09:30 pm
PASS
30/0/0