8 records 5 compliant 3 non-compliant click on any row to re-run the engine
| WPS / Title | Code | Domain | Process | P-No → F/A-No | T-Range (mm) | PWHT | Score | Status | Updated | Actions |
|---|---|---|---|---|---|---|---|---|---|---|
| WPS-IEW-2026-108 Rev.0DMW nozzle attachment P-1 shell to P-8 nozzle neck (filler under review) | ASME IX | Pressure Vessel | GTAW | P-1↔P-8 → F-6/A-1 | 8–16 | N/R | 97 | NON_COMPLIANT | 24 Feb 2026 | |
| WPS-IEW-2026-107 Rev.0SMAW shell-to-compression-ring welds, A537 Cl.1 tank (CVN −20°C) | ASME IX | Storage Tank | SMAW | P-1 → F-4/A-1 | 16–20 | N/R | 100 | VALIDATED | 21 Feb 2026 | |
| WPS-IEW-2026-106 Rev.1FCAW girder flange-web fillet welds, shop fabrication (winter shift preheat) | AWS D1.1 | Structural Member | FCAW | P-1 → F-6/A-1 | 10–40 | N/R | 97 | NON_COMPLIANT | 18 Feb 2026 | |
| WPS-IEW-2026-105 Rev.0SAW longitudinal seam, boiler drum shell course 50 mm (PWHT pending review) | IBR | Boiler Manufacturing | SAW | P-1 → F-6/A-1 | 50–100 | N/R | 97 | NON_COMPLIANT | 15 Feb 2026 | |
| WPS-IEW-2026-104 Rev.0GTAW fused-root + filler, 316L process piping for cryogenic duty | ASME IX | Pipe / Pipeline | GTAW | P-8 → F-6/A-8 | 4–8 | N/R | 100 | VALIDATED | 12 Feb 2026 | |
| WPS-IEW-2026-103 Rev.0Mainline girth weld, cellulosic downhill SMAW, API 5L X60 | API 1104 | Pipe / Pipeline | SMAW | P-1 → F-3/A-1 | 6–25.4 | N/R | 100 | VALIDATED | 09 Feb 2026 | |
| WPS-IEW-2026-102 Rev.1GMAW spray-transfer groove weld for jacket structure (impacts −20°C) | ISO 15614 | Structural Member | GMAW | P-1 → F-6/A-1 | 16–25 | N/R | 100 | VALIDATED | 06 Feb 2026 | |
| WPS-IEW-2025-101 Rev.3SMAW double-V butt weld, P-1 pressure boundary (SA-516 Gr.70) | ASME IX | Pressure Vessel | SMAW | P-1 → F-4/A-1 | 5–40 | REQ | 100 | VALIDATED | 03 Feb 2026 |