Indian Engineer · IEW-2026

WPS Detail

🟢 System Active
Back to registry

WPS-IEW-2026-104

Rev. 0VALIDATEDASME IXPipe / Pipeline

GTAW fused-root + filler, 316L process piping for cryogenic duty

ISGEC Hitachi Zosen Ltd., Dahej Er. A. Subramanian (IWE)updated 12 Feb 2026, 09:30 pm

100

score

Edit Audit Report

Base Metals & Thickness — QW-403 / QW-451

Specification
SA-312 TP316L
P-Number
P-No. 8
Group No.
1
Dissimilar side
Same P-No.
Qualified range
4 – 8 mm
Coupon T
8 mm
Diameter
OD 21.3 – 219.1 mm
Toughness
CVN specified

Filler Metals — QW-404 / QW-432 / QW-442

Filler spec
SFA-5.9
Classification
ER316L
F-Number
F-No. 6
A-Number
A-No. 8
Process
GTAW
Transfer mode
—
Joint type
V-Groove Butt
Position
6G

Thermal Cycle — QW-406 / QW-407

Preheat min
15 °C
Interpass max
150 °C
PWHT
Not required
PWHT soak
—
PWHT hold
—
Joint design
Single-V 70°, 1.5 mm gap, fused root with pure Ar backing

Electrical, Technique & Shielding — QW-408 / QW-409

Current
DCEN
Amperage
90–160 A
Voltage
10–14 V
Travel speed
90–150 mm/min
Heat input cap
1.5 kJ/mm
Shielding
Argon 99.995% (I1)
Flow
12 L/min
Backing
Argon 99.995%
Supporting PQR
PQR-IEW-2026-104

Validation Findings

latest run 12 Feb 2026 by a.subramanian@isgec.com

PASS

Supporting PQR referenced

EssentialQW-200.1 / QW-200.2

Qualified by PQR PQR-IEW-2026-104. Traceability established.

Base metal P-Number assigned

EssentialQW-403.1 / QW-422

Base metal group P-No. 8 Gr.1 — SA-312 TP316L.

Dissimilar-metal weld compatibility

EssentialQW-403.2 / QW-403.3

Joint is between identical P-Numbers — no dissimilar-metal restrictions apply.

Thickness qualification range (coupon)

EssentialQW-451.1 / QW-451.2

Range 4–8 mm within qualified 4–8 mm for 8 mm test coupon.

Thickness range sanity

Non-EssentialQW-451

Commercial range 4–8 mm is within conventional procedure limits.

Small-bore thin-wall root control

Non-EssentialQW-404.30 / QW-405

Diameter statement “OD 21.3 – 219.1 mm” compatible with GTAW root technique.

Minimum preheat temperature

EssentialQW-406.1

Preheat ≥ 15°C satisfies the 10°C minimum for P-No. 8 base metal.

Interpass temperature ceiling

EssentialQW-406.3

Interpass 150°C within 150°C ceiling (toughness-restricted).

Thermal window logic

Non-EssentialQW-406

Thermal window 15–150°C is internally coherent.

Mandatory PWHT by thickness/code

EssentialQW-407.1 / UCS-56

PWHT not invoked — permitted for this material/thickness/code combination.

PWHT cycle parameters

EssentialQW-407.4 / QW-407.5

PWHT not required — cycle parameters not applicable.

PWHT soak window & hold adequacy

Suppl. EssentialQW-407.5 / UCS-56 Table

PWHT not required — soak band check not applicable.

F-Number consistent with process

EssentialQW-404.3 / QW-432

F-No. 6 (ER316L) is consistent with GTAW.

Weld-metal A-Number compatibility

EssentialQW-404.5 / QW-442

A-No. 8 weld deposit is chemically matched to P-No. 8.

Shielding gas / medium per process

EssentialQW-408.1

Shielding medium “Argon 99.995% (I1)” acceptable for GTAW.

Root backing gas protection

Suppl. EssentialQW-408.5 / QW-408.8

Root protection declared: Argon 99.995%.

Shielding gas flow rate

Non-EssentialQW-408.1

Flow 12 L/min within the 8–20 L/min band for GTAW.

Current type & polarity

EssentialQW-409.1 / QW-409.4

DCEN polarity consistent with GTAW and ER316L.

Amperage operating window

Non-EssentialQW-409.2 / QW-409.3

Amperage 90–160 A inside the GTAW operating envelope.

Arc voltage operating window

Non-EssentialQW-409.4

Voltage 10–14 V inside the GTAW operating envelope.

Travel speed control

Non-EssentialQW-409.9

Travel speed 90–150 mm/min is plausible for GTAW.

Heat input ceiling (toughness)

Suppl. EssentialQW-409.1 (suppl. essential)

Heat input ≈ 1.49 kJ/mm within 1.5 kJ/mm toughness ceiling.

Welding position qualification

Non-EssentialQW-405 / QW-461.9

6G inclined-fixed qualification covers all pipe groove positions (QW-461.9 matrix).

GMAW metal-transfer mode

EssentialQW-409.32

Transfer-mode variable applies to GMAW only (GTAW exempt).

Process admissibility under code

EssentialQW-250 series

GTAW is an admissible process under ASME IX.

ISO 15614 impact-test mandate

Suppl. EssentialQW-403.5

Notch-toughness regime declared — impacts covered as supplementary essential variables.

Storage-tank qualification route

EssentialQW-200 (via API 650 §9.2)

Tank-specific routing not applicable.

IBR statutory governance

EssentialQW-201

IBR statutory route not applicable to this scope.

Administrative data completeness

Non-EssentialQW-201.1

Administrative header fields adequately populated for issue.

Group Number under toughness

Suppl. EssentialQW-403.5

Group No. 1 recorded for notch-toughness control.

Run History

a.subramanian@isgec.com

12 Feb 2026, 09:30 pm

PASS

30/0/0